Physical and engineering infrastructure

Composition of CShark equipment CSharks equipment composition

From the parking space to the server node: cameras, displays, traffic lights, bollards, charging stations, network, computing circuit, uninterruptible power supply, electrical, cabinets, cable lines and as-built documentation.

facility infrastructure / by design under control
01Parking space equipmentcameras · scoreboards · traffic lights · bollards · charging stationsOBJECT
02Distribution cabinetsswitching · PoE · power · UPS · switchingBY PROJECT
03Object highwayoptics · redundancy · network segmentsHIGHWAY
04Server circuitlocal node · applications · database · video · reserveCORE
05CSharkDEVICE MANAGEMENTstatus · commands · diagnosticsCONTACT US

System composition

Equipment and infrastructure for facility calculations

The exact specification is formed after inspection and calculation of coverage. The design includes active devices, cabinets, patch panels, communication lines, power, labeling, fasteners and coordinated reserve.

01

Information boards

Single line direction signs; display of the number of seats on the left and right; floor and interfloor meters; full-color screens without advertising or with advertising and information blocks.

  • arrow + number
  • left/right
  • floor/zone
  • full color screen
  • IP / RS-485 / discrete inputs and outputs.
02

The CShark SPC and CShark DSPC cameras are available in two versions.

The CShark SPC with one lens monitors up to 3 parking spaces, the CShark DSPC with two lenses monitors 6. The cameras detect occupancy, recognize license plates, find violations and forgotten items, and the lower light indicator shows the status of the zone right in the driveway.

  • 4 MP
  • 3 / 6 seats
  • GRZ
  • PoE 802.3af
  • RTSP / ONVIF
03

Charging stations

The system displays the status of the connectors, transmits charging session commands, receives power and errors, links the station to the parking lot and the user.

  • connector condition
  • start and stop
  • power and energy
  • session cost
  • error notifications
04

Traffic lights and bollards

The bollard command takes into account the position of the vehicle in the protective zone, and the traffic light shows the allowed, prohibited or reversing direction.

  • red/green signal
  • reverse drive
  • lifting and lowering
  • protection zone control
  • manual and emergency modes
05

Active network equipment

Managed PoE switches, industrial switches and routers, interconnect screens, SFP modules, media converters and backup communication channels.

  • PoE power reserve
  • virtual networks
  • optical backbone
  • firewall
  • monitoring
06

Passive network infrastructure

Copper and optical cable lines, patch panels, optical cross-connects, patch cords, sockets, trays, cable channels, penetrations, markings and cable management systems.

  • category 6/6A
  • optical lines
  • optical cross
  • patch panels
  • cable management
07

Server equipment

The composition depends on the delivery model. In a local installation, the platform servers and databases are hosted by the customer; with a cloud service, only the necessary local nodes, video and autonomous circuit equipment remain on site.

  • local node
  • database
  • video storage
  • backup
  • virtualization
08

UPS and power supply

Uninterruptible power supplies, power distribution units, circuit breakers, surge protectors, power supplies, distribution boxes, relays, contactors, input control, grounding and autonomy calculations.

  • uninterruptible power supply
  • power distribution
  • automatic reserve entry
  • overvoltage protection
  • power control
09

Cabinets and installation infrastructure

Central and floor 19-inch cabinets, air conditioning, locking, door and temperature sensors, shelves, organizers, mounting panels, fastenings and technological reserve.

  • storey cabinets
  • server rack
  • air conditioning
  • access control
  • technological reserve

Information system

Scoreboard for design decision points

The format is selected based on reading distance, movement speed, number of directions, illumination and volume of information. The scoreboards receive consistent data from the digital twin.

P331

One line direction

Arrow, floor or zone and the number of available seats in the selected direction.

direction selection point
1826

Quantity on sides

Distributes the flow left and right without forcing the driver to read a long message.

left / right
FREEP422

Floor board

Shows free spaces in a level, zone or category at the ramp and path selection point.

level capacity
CSharkP1 · 18

Welcome

INFO / ADVERTISING

Full color media board

Combines navigation with object messages. An advertising unit is included or excluded by the project.

RGB · optional media

Intelligent video analytics

The CShark camera sees every parking lot.

One overhead node integrates video monitoring, license plate recognition, occupancy detection, abandoned object detection, lighting and navigation events. The color of the lower indicator is visible to the driver directly in the passage.

Airports

Covered short-term and long-term parking, terminal areas, service and rental sectors.

1 or more levels

Residential complexes

Underground and built-in parking for residents, guests, family cars and private spaces.

body · section · level

Office buildings

Covered parking for employees, tenants, visitors, managers and service providers.

sectors · levels · visitors

Commercial properties

Hotels, medical centers and multifunctional complexes with project configuration.

local object or network

Shopping centers

Single-level and multi-level indoor parking lots with navigation to entrances, areas and shops.

flow · loyalty · navigation
CShark / CAMERA PARKING PLACE CONTACT US
CShark SPC and CShark DSPC intelligent ceiling cameras for parking space monitoring.
CShark SPC / DSPCSPC · SMART PARKING CAMERA
DSPC · DUAL SMART PARKING CAMERA

Car parking camera

Source of parking space status

The camera receives an image of parking spaces in real time, recognizes the car and license plate, changes the status of the space no later than 3 seconds and immediately shows the status of the zone using the color of the lower indicator.

Open 3D model
BOTTOM INDICATOR LIGHTThere is free space

A green light means that at least one regular parking space is available in the camera's viewing area.

99,8%busy recognition
99,6%number recognition
≤ 3 cchange in seat status
16 pcs.cameras in a PoE chain.
  • Occupancy and numberLinks a specific vehicle to a specific location.
  • Events on siteCrossing a marking, a foreign object, prolonged presence of a person or stopping outside the boundaries of the place.
  • Navigation and searchFree space indication, reverse car search and precise BLE navigation.
  • Remote setupAutomatic construction of site boundaries and remote angle adjustment.
Left things and obstaclesThe CShark detects a trolley, suitcase, box or other foreign object on the spot. The camera turns on an orange backlight, transmits the image to the operator and creates a task to remove the obstacle. Video analytics scenarios

Location on site

The camera is installed above the passage and sees places on both sides

CShark SPC controls up to three seats in one row. CShark DSPC control up to six seats on two opposite rows. The passage remains free, each seat has a straight trajectory of manoeuvre.

FreeBusyFound
  1. 01

    The car takes up spaceThe camera records the appearance of the car and its steady stop.

  2. 02

    The number is determinedSurveillance links the vehicle to the location and camera frame.

  3. 03

    The entire object is updatedThe scoreboard, operator card and application receive a new status.

Floor P3 sector A/B
3 free DSPC-03 · green
P3-A-41Busy
A111AA77RUS
P3-A-42Free
P3-A-43Busy
M472KT197RUS
DSPC-03
Two-way travel
P3-B-41Free
P3-B-42Busy
S837TR50RUS
P3-B-43Free

Configurations

CShark SPC and CShark DSPC

Both models operate in a single CShark circuit. The SPC is selected for controlling one row of up to 3 seats, the DSPC for simultaneous control of two opposite rows of up 6 seats. The final configuration is determined by calculating the geometry of the facility.

ParameterCShark SPCCShark DSPC
Image4 MP · 2560 × 1440 · H.2644 MP · 2560 × 1440 · H.264
Construction1 lens2 lenses
Coverageup to 3 seats in one rowup to 6 seats in two opposite rows
Optics2.8 / 4 / 6 mm2.8 / 4 mm
Angle adjustmentManual adjustment during installation · initial position -20° · downward adjustment to -40° · no remote controlRemote independent adjustment of each lens -20° to -40°
SoundVoice messages and downloadable audio eventsNo audio channel
Vehicle dataLicense plate and car without license plateNumber, country, make, model, type and color of the car
Indicator lightGreen · red · purple · flashing · orangeGreen · red · purple · flashing · orange
Dimensions112 × 112 × 95 mm129 × 129 × 122 mm
NetworkTCP/IP · DHCP · HTTP · NTP · RTSP · ONVIF InterfacesPoE 802.3af · BLE 4.2 · RS-485 FoodDC 12 V range 8-36 V camera ≤ 3 W Wednesday-20 °C to +60 °C

The indicators are based on the technical specifications of the camera hardware platform. The final accuracy and functionality are confirmed by design calculations, calibration and on-site acceptance testing.

System structure

From parking equipment to CShark applications.

Cameras, signs, traffic lights, bollards and charging stations are connected via the distribution network to the server loop. CShark forms the parking status, executes permitted commands and saves the result.

01 · FIELDCShark SPC / DSPC1/2 lens 3/6 seats
02 · FLOORPoE segment.up to 16 cameras in a chain
03 · OBJECTEdge and videoevents, footage, storage
04 · PROGRAM PARTDigital cardplace, number, observation
05 · INTERFACESScoreboard and applicationsnavigation, search, operator
Ethernet / PoE / IPOptical backboneRS-485 / I/O / dry contactPower supply
LEVEL 01Parking space equipmentfloors · passages · zones · places
CShark SPC / DSPC1/2 lens · 3/6 places · LPRPoE · IP
Scoreboardline / split / floor / RGBIP · RS-485
Place sensorsultrasound / magnet / IoTbus · IoT
Control zonesmovement · intensity · landmarksVIDEO
Communicationintercom · terminal · QRIP · SIP
Charging stationsconnector · session · energy · errorIP CONTROL
Traffic lights and bollardsdirection · travel restriction · protection zoneIP · RS-485 · I/O
LEVEL 02Floor distribution cabinetone or more per floor according to line calculations
Patch panel / ODFtermination and marking
PoE switchVLAN · uplink · telemetry
Controllers / PSUI/O · RS-485 · DC power
UPS/PDUreserve and distribution
LEVEL 03Central server cabinet of the facilityserver or dedicated engineering area
ODF and core switchfloor aggregation
Firewall/Routerperimeter and secure channel
CSharkEdge / appruntime of the object
DB / storage / VMSdata, video, backup
Online-UPS / PDUautonomy by calculation
LEVEL 04CSharkPLATFORMlocal · cloud service · combined
CSharkDevice Hubpassports and health
Digital twinplaces and connections
Rules enginedecisions and commands
Jobsoperator and engineer
User servicessearch · route · session · payment
SEPARATE POWER CIRCUIT
Input 380/220 Vfrom the agreed shieldAutomatic devices + SPD + ATSprotection and switchingUPScalculation of power and autonomyPDU / DC PSUload distributionServers · network · fieldconsumption control

Construction options

How the CShark equipment is connected at the site

The diagram will show the data path from the cameras to the CShark server, the composition of network nodes and interfaces in which the result is used.

MULTILEVEL OBJECT

Floor cabinets and a single server node

The cameras, panels and terminals on each floor are connected to the nearest distribution cabinet. The cabinets are connecting via optical bus to the CShark server hub.

  • Short PoE lines connect the equipment to the floor cabinet; short PoE cables connect the device to the wall cabinet.
  • the optical backbone transmits data between floors;
  • The CShark server creates a single map of places and events; the CSharks are used to create a map of locations and events.
  • the scoreboard, operator and driver receive one current state.
CONNECTION DIAGRAMData path on a multi-level object
Videos and events are sent to CShark.
RESULTWhere CShark sends the parking status.
COMMUNICATION CHANNELS
PoE on floors, optics between cabinets.
PROCESSING
object server node
IN THE EVENT OF CONNECTION LOSS
negotiated offline mode

Design parameters and acceptance

Design parameters and acceptance of equipment.

In the project we record composition, placement, power supply, network and reserve. At acceptance we check the cross-functional function, diagnostics and recovery after failure.

EquipmentIn the project, there is a project.At the reception, the owner was very friendly.
CShark SPC / DSPC cameras

Installation points, viewing areas, power, network, associated locations and backlight modes.

Busy, number recognition, indication, loss of connection and restoration.

Charging stations

Model, power, connectors, parking spaces, power, network, tariffs and available commands.

Status, reservation, start, stop, energy, cost, error and notification.

Information boards

Format, location, reading distance, interface, power supply and indicator source.

Same meaning with digital twin, readability and backup message.

Network and passive infrastructure

Ports, PoE budget, copper and optical lines, cabinets, patch panels and marking.

Line measurements, reserve, segmentation, port diagnostics and log compliance.

Servers, storage and UPS

Load calculation, storage depth, redundancy, autonomy and monitoring.

Workload, switching, recovery, notification and event persistence.

Electrical and grounding

Circuits, protection, selectivity, powers, connection points and potential equalization.

Measurements, markings, safety shutdowns and the impact of power loss on functions.

Implementation in the project

From floor plan to as-built diagram

Each device receives a position on the plan, a code, a communication line, a port, an address, a power circuit, a dependency in the digital twin, and an acceptance test.

  1. 01
    Survey

    Plans, routes, cabinets, power inputs, lighting, angles, stripes, customer decisions and installation restrictions.

    plans · photos · measurements
  2. 02
    Working draft

    Structural and electrical diagrams, layout plans, coverage calculations, topology, network segments and addresses, power supply and UPS.

    set of working documentation
  3. 03
    Specification and assembly

    Specification, compatibility, reserve, cabinet layout, labeling, bench testing and incoming inspection.

    specification · factory tested
  4. 04
    Installation and connection

    Cable lines, cabinets, cameras, displays, power supply, switching, grounding, measurements and recording of actual routes.

    installation
  5. 05
    Commissioning

    Addressing, firmware, device-to-site communication, calibration, commands, events, fallback order and end-to-end scenarios.

    on-site testing · commissioning
  6. 06
    Executive kit

    Executive diagrams, cable logs, port plans, passports, protocols, backup copies of configurations and maintenance regulations.

    commissioning
Accommodation planscameras · scoreboard · cabinets · tracks
Block diagramcopper · optics · interfaces
cable magazinefrom · where · port · brand
IP/VLAN planaddresses · segments · rules
Power calculationpower · UPS · autonomy
Test programfactory · object · user